145GSE
AIRFRAME TOOLING

Boeing 787

Composite-airframe twin-aisle — 787-8, -9, -10

4,148 products in catalog·Variants: 787-8, 787-9, 787-10

The Boeing 787 Dreamliner is the first commercial widebody with a composite primary structure. Powered by GE GEnx-1B or RR Trent 1000, 787 MRO tooling demand has scaled rapidly as the in-service fleet has grown past 1,000 aircraft. 145GSE supplies composite-airframe-friendly access tooling, GEnx-class engine handling, and landing gear rigs sized for the 787 envelope.

Featured products

Top 12 of 4,148 Boeing 787-compatible items in the catalog.

View all 4,148 products
145GSE
1-7/8-16
Jam nut
CF6-80C2GEnx-1B
145GSE
10C1083G01
Extension, shaet-hpt rotor
CF6-80C2GEnx-1B
145GSE
10C1085G02
Plunger,install/remove-hp turb rtr balance weights
CF6-80C2GEnx-1B
145GSE
10C1089G01
Fixture,strat/remove hp turb rotor nuts
CF6-80C2GEnx-1B
145GSE
10C1090G01
Adapter,torque-hpt rotor to compressor rotor nuts
CF6-80C2GEnx-1B
145GSE
10C1093G01
Fixture,lift-hp turb rir,horiz
CF6-80C2GEnx-1B
145GSE
10C1094G01
Puller,impact-hich pressure turbine shroud removal
CF6-80C2GEnx-1B
145GSE
10C1097G01
Tool set, install/ remove - lp turb mdl to core mdl
CF6-80C2GEnx-1B
145GSE
10C1098G01
Pin,set,alignment-hpt rotor disk to shaft
CF6-80C2GEnx-1B
145GSE
10C1099G01
Tool installation,ltp fwd coupling nut retaining ring
CF6-80C2GEnx-1B
145GSE
10C1100G02
Fixture, restraining core module, aft
CF6-80C2GEnx-1B
145GSE
10C1103G01
Fixture,clamping-no 3 bearing assembly,inlet bearbox
CF6-80C2GEnx-1B

Composite-airframe-friendly tooling

787 inspection ports and access panels interface with composite skin panels — tooling must avoid metal-on-composite contact and concentrated point loads. Our 787 access tooling line includes foam-padded standoffs, low-load suction fixtures, and torque-controlled fastener removal kits sized to composite fastener pull-out limits.

GEnx-1B and Trent 1000 — engine tooling

787 engines are interchangeable at the airframe interface — both GEnx-1B and Trent 1000 fit the same nacelle. However, engine-section tooling does NOT cross-platform between the two engines. Always confirm engine variant before ordering engine-section fixtures.

Compatible engines

GE GEnx-1B

Common questions

View all FAQ →
QWhat Airbus airframe tooling do you carry?
A319, A320, A321 (full A320 family) — nose landing gear tow bars, jacking pads, control surface rigging fixtures, fuel tank entry kits, wheel-well access stands. A330 — landing gear handling rigs, engine transport stands. A300 / A310 — legacy fleet support tooling. A350 / A220 tooling on custom-build basis.
QWhat Boeing airframe tooling do you carry?
B737 NG and B737 MAX — engine transportation dollies, nose-gear tow bars, slat / flap rigging fixtures, fuel-tank entry tooling. B747 — large-frame jacks and engine handling. B767 — landing gear and engine maintenance. B777 — engine transport, fan-blade handling, IPC support. B787 — composite-airframe-friendly tooling for inspection ports.
QDo you have universal tooling that fits multiple airframes?
Yes. About 12–15% of our catalog is platform-agnostic — torque wrench sets, calibrated jacks, hangar dollies, ESD-safe work mats, hand-tool kits, and consumable inspection ports. Universal tooling typically ships in 2–4 weeks vs. 4–8 weeks for platform-specific fixtures.
QAre landing-gear tools airframe-specific?
Yes — landing-gear handling, towing, and disassembly rigs are airframe-specific because gear geometry and load paths differ between A320 / B737 / A330 / B777. Sharing tooling across families is unsafe. Each LG tool ships with the applicable airframe / serial range printed on the tool body and on the calibration certificate.

Don't see what you need?

Send drawings, a worn sample, or a part-number list — an engineer reviews every inquiry and replies within 48 hours. Custom Boeing 787 tooling is built to drawing on a 8–14 week lead time.