145GSE
ENGINE TOOLING

IAE V2500

A319 / A320 / A321 alternative engine tooling — IAE 1F Series

5,594 products in catalog·Variants: V2500-A1, V2500-A5, V2500-D5

The IAE V2500 is the IAE consortium powerplant (P&W / Rolls-Royce / JAE / MTU joint venture) for the Airbus A320 family — the alternative to CFM56-5B. The V2500-A5 series powers most active A320 / A321 ceo deliveries, with over 6,000 engines flying. 145GSE manufactures the IAE 1F Series tooling family for V2500 engine assembly, disassembly, and module handling, including the Hurel-Hispano nacelle interface tooling specific to V2500-equipped airframes.

Featured products

Top 12 of 5,594 IAE V2500-compatible items in the catalog.

View all 5,594 products
145GSE
PWA211430
STAND, TRANSPORT
V2500A319
145GSE
956A6070
Engine Transportation Stand
CFM56V2500
145GSE
CONTAINER V2500-A5
V2500-A5 HPC ROTOR SHIPPING CONTAINER
IAE V2500-A5A319
145GSE
PWA1432
FIXTURE
V2500A319
145GSE
M3.31000T1
TORQUE MULTIPLIER
CFM56V2500
145GSE
IAE 1F 10001B
IAE V2500 1F Series Tooling
V2500-A1V2500-A5
145GSE
IAE 1F 10011A
IAE V2500 1F Series Tooling
V2500-A1V2500-A5
145GSE
IAE 1F 10012C
IAE V2500 1F Series Tooling
V2500-A1V2500-A5
145GSE
IAE 1F 10015A
IAE V2500 1F Series Tooling
V2500-A1V2500-A5
145GSE
IAE 1F 10016A
IAE V2500 1F Series Tooling
V2500-A1V2500-A5
145GSE
IAE 1F 10017A
IAE V2500 1F Series Tooling
V2500-A1V2500-A5
145GSE
IAE 1F 10018A
IAE V2500 1F Series Tooling
V2500-A1V2500-A5

IAE 1F Series tooling

The IAE 1F Series is the standardized V2500 maintenance tooling kit covering fan section, compressor, combustion, and turbine module work. Our 1F Series catalog includes the kit-IDs IAE1P (IAE standard) and HU (Hurel-Hispano nacelle) cross-referenced from the original tooling list. Each fixture carries dual identification: our serial number plus the IAE kit-ID for cross-reference with OEM maintenance manuals.

Nacelle handling — Hurel-Hispano interface

V2500 nacelles use Hurel-Hispano (now Safran Nacelles) interface fixtures distinct from CFM56 nacelles. We supply the full HU-prefix tooling — thrust reverser handling stands, fan cowl rigging fixtures, exhaust nozzle alignment kits — built to specified loads and shock-isolation requirements for narrow-body MRO bays.

V2500 vs. CFM56-5B operational differences

While V2500 and CFM56-5B power the same airframes, the engines are mechanically distinct — different LPT module geometry, different fuel-control architecture, different gearbox layout. Tooling does NOT cross-platform. We tag every fixture with its applicable engine series so MRO planners can confirm fitment before quoting.

Aircraft this engine powers

Airbus A320 family

Common questions

View all FAQ →
QDo you stock CFM56 tooling?
Yes. We carry tooling for CFM56-5A, CFM56-5B, and CFM56-7B variants — fan section assembly fixtures, LPT module stands, HPC borescope ports, fan blade transport racks, and engine transportation dollies. The CFM56 catalog is our largest engine-tooling subset; most items ship from stock or in 4–6 weeks.
QDo you make IAE V2500 tooling?
Yes. We supply V2500-A1 and V2500-A5 tooling including the IAE 1F Series tooling family (engine assembly/disassembly fixtures), nacelle handling rigs (Hurel-Hispano interface), and module transportation stands. V2500 and CFM56-5B tooling sometimes shares fixtures because both engines power the A320 family.
QWhat about Rolls-Royce Trent tooling?
Yes. Trent 700 (A330) and Trent 800 (B777) tooling is stocked or built-to-order — fan blade balance fixtures, LPT/HPT module handling, intermediate pressure compressor support stands, and combustor inspection ports. Lead time on Trent custom fixtures is 8–12 weeks given the larger physical envelope vs. CFM56-class engines.
QDo you support GE CF6 and GEnx engines?
Yes. CF6-80C2 (B747, B767, A300, A310) and GEnx-1B (B787) tooling is in our catalog — module handling stands, fan blade racks, HPC borescope kits, and combustor liner inspection fixtures. We also cross-reference older GE / Snecma kit IDs from legacy maintenance manuals for customers running mixed fleets.

Don't see what you need?

Send drawings, a worn sample, or a part-number list — an engineer reviews every inquiry and replies within 48 hours. Custom IAE V2500 tooling is built to drawing on a 8–14 week lead time.